PROJECT NAME : Bintulu Port
Sdn. Bhd.
LOCATION : Bintulu, Sarawak.
DATE : November, 2001
Job Scope :
a) Install 4 Core 95mm sq. PVC/SWA/PVC cable - 1000m.
b) Install 12 Core Multimode Fiber Optic cable - 1500m.
c) Install 12 Core 1.5mm sq. PVC/SWA/PVC cable - 1000m.
d) Install 2Way 100mm dia. PVC piping encased in concrete - 1500m. |
|
Picture 1
- PVC piping with draw-wire.
Picture 2
- Direct Burial Power cable with cable slab.
- PVC piping encased in concrete for Fiber Optic and Control cable to Reservoir.
- HDPE pipe for Water supply to Reservoir (by other contractor).
Picture 3
- Bintulu Port Reservoir.
Picture 4
- Bintulu Port Radar Station located at Malaysia Liquiefied Natural Gas(MLNG) Hilltop.
Picture 5
- Encased of PVC piping with concrete.
:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
|
|
PROJECT NAME :
Synthese Malaysia Sdn. Bhd.
LOCATION : Tangga Batu Industrial
Estate, Melaka.
DATE : February,
2002
Job Scope :
a) Structured Cabling Systems with 25
Years Systems.
b) Performance Warranty by Molex Premises Networks.
|
|
Picture 1
-
Certified Site Warranty Card.
Picture 2
- Structured Cabling Design
Picture 3
- Certified Systems Specifications.
Picture 4
- Global Warranty Program.
Picture 5
- Fiber Optic cable running in existing Telephone Manhole.
Picture 6
- Overhead Trunking to support the Fiber Optic Cable.
|
|
PROJECT NAME :
Taman Belatuk Emas.
LOCATION : Durian Tunggal, Melaka.
DATE : February,
2002
Job Scope :
a) Telephone Infrastructure Works for
Housing Development.
|
|
Picture 1
-
Excavation Works.
Picture 2
- Trenching for 4 Way 100mm Pipes.
Picture 3
- Precast JC9C Manhole.
Picture 4
- Interior of Precast JC9C Manhole with Draw-wire.
Picture 5
- Precast JC9C Manhole.
Picture 6
- JC9C Manhole construct on-site with cover.
Picture 7
- JC9C Manhole construct on-site.
|
|
|