PROJECT NAME : Bintulu Port Sdn. Bhd.
LOCATION : Bintulu, Sarawak.
DATE : November, 2001

Job Scope :
a) Install 4 Core 95mm sq. PVC/SWA/PVC cable - 1000m.
b) Install 12 Core Multimode Fiber Optic cable - 1500m.
c) Install 12 Core 1.5mm sq. PVC/SWA/PVC cable - 1000m.
d) Install 2Way 100mm dia. PVC piping encased in concrete - 1500m.

Picture 1
- PVC piping with draw-wire.

Picture 2
- Direct Burial Power cable with cable slab. 
- PVC piping encased in concrete for Fiber Optic and Control cable to Reservoir. 
- HDPE pipe for Water supply to Reservoir (by other contractor).

Picture 3
- Bintulu Port Reservoir.

Picture 4
- Bintulu Port Radar Station located at Malaysia Liquiefied Natural Gas(MLNG) Hilltop.

Picture 5

- Encased of PVC piping with concrete.

:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::

PROJECT NAME : Synthese Malaysia Sdn. Bhd.
LOCATION : Tangga Batu Industrial Estate, Melaka.
DATE : February, 2002

Job Scope :
a) Structured Cabling Systems with 25 Years Systems.
b) Performance Warranty by Molex Premises Networks.

Picture 1
- Certified Site Warranty Card.

Picture 2
- Structured Cabling Design

Picture 3
- Certified Systems Specifications.

Picture 4
- Global Warranty Program.

Picture 5
- Fiber Optic cable running in existing Telephone Manhole.

Picture 6
- Overhead Trunking to support the Fiber Optic Cable.

PROJECT NAME : Taman Belatuk Emas.
LOCATION : Durian Tunggal, Melaka.
DATE : February, 2002

Job Scope :
a) Telephone Infrastructure Works for Housing Development.

Picture 1
- Excavation Works.

Picture 2
- Trenching for 4 Way 100mm Pipes.

Picture 3
- Precast JC9C Manhole.

Picture 4
- Interior of Precast JC9C Manhole with Draw-wire.

Picture 5
- Precast JC9C Manhole.

Picture 6
- JC9C Manhole construct on-site with cover.

Picture 7
- JC9C Manhole construct on-site.